A 540,000 SF Class ‘A’ office tower in the heart of Toronto’s financial core. Adorned in polished granite, visitors are welcomed with a sophisticated soaring lobby with inlaid marble floors, polished granite walls and a bank of 11 high-speed elevators. Operating to high sustainability and environmental standards, 121 King boasts a multitude of on-site amenities including a fully equipped & wired conference facility to meet all your needs. Concourse retailers connect 121 King directly to Toronto’s PATH system while the building is steps from the St. Andrew subway and a short walk from Union Station. If driving in, no problem - 121 King offers two levels of secured underground parking.

Renovation Program Underway

121 KING STREET WEST
BUILDING IS UNDERGOING STUNNING REJUVENATION

UPGRADED AMENITIES AND INTRODUCTION OF NEW RETAIL

NEW AMENITY LOUNGE

MODEL SUITE PROGRAM UNDERWAY

ELEVATOR COMMON AREA LOBBY UPGRADES

OUTDOOR TERRACE

WASHROOM MODERNIZATION

Building Properties

YEAR BUILT

1984

RENOVATED

2022

LOCATION

Located centre stage in Toronto’s financial district directly across from the Toronto Stock Exchange. One block from the King/Bay intersection. Directly connected to the PATH underground pedestrian walkway system. Easily accessible from the King streetcar route and GO Train at Union Station.

GROSS LEASABLE AREA

Approximately 517,522 SF

TOTAL RETAIL SPACE

10,666 SF

AMENITIES

RETAIL - Concourse retail outlets
CONFERENCE CENTRE - Offers a functional, quality environment for hosting meetings and receptions for up to 100 people, complete with concierge service. Advanced telecommunication capabilities and a fully equipped service kitchen.

CONSTRUCTION FEATURES

Fibre optic available

DESIGN FEATURES

CONSTRUCTION - Steel frame structure with reinforced concrete core. Polished granite exterior walls.
CEILING SYSTEM - The building is equipped with a modular suspended acoustic tile. The ceilings are 8’9” high, and the module 4’9” (1.5 m).
2 washrooms per floor.

CEILING/LIGHTING

All fluorescent lighting fixtures upgraded to T-8 lamps with electronic ballast providing approx. 55 foot candles at desk-top level. Combined lighting + power = 5 to 16 watts/sf.

HVAC

Automatic HVAC system featuring a variable volume air supply and hot water perimeter heating. Air volume is replaced approx. every 20 minutes with fresh air replenished every ½ hour. Each floor has 35 thermostatically controlled zones (additional zones can be provided).

ELEVATORS

11 passenger elevators, 1 parking elevator, 1 freight elevator

PARKING

2 levels of parking with 189 parking stalls.

BUSINESS HOURS

Monday to Friday 7:30am to 6:30pm

Modern Conference Centre

Upgraded Corridors and Elevator Bays

Enhanced end of trip facilities

Sustainable Building Initiatives

ENERGY, WATER AND GREENHOUSE GASES

Our strategy is to reduce the consumption of utilities and emissions of greenhouse gases. We recognize that a building’s energy use is impacted by a) the systems in the building, b) how the building is operated and c) what the occupants, our tenants do in the building. In order to achieve best-in-class performance, energy savings typically need to be targeted in all three impact areas. With an overall objective to reduce 10% of energy use, we begin with importing prior years’ history of energy use in our EcoTracker system, setting preliminary target areas in the 3 categories identified above then developing an action plan to meet the objectives on an annual basis.

WASTE MANAGEMENT

We have implemented Waste Reduction and Recycling programs at all of our sites. Waste diversion reports are received monthly and analyzed on a quarterly basis and revised target setting, implemented annually. Recycling programs are in place with recycling containers provided for the collection of Paper, Plastics, Glass and Organics. We also collect e-Waste (batteries, toner, computers, printers, cellphones etc.) as well as wood material, writing instruments and eye glasses.

INDOOR/OUTDOOR ENVIRONMENT

We are implementing standards and practices that are conducive to healthy environments, indoors and out.

We have installed drought resistant planting and native vegetation. Our green landscape management plan, uses environmental herbicides, fertilizers and integrated pest management specifications. Winter ice melting program utilize sustainable eco-labeled solutions and products. We’ve upgraded our outdoor lighting system to minimize the impact it has on the local bird population to reduce involuntary strikes.

Indoors, we prefer architectural features that support energy efficiency and occupant comfort, such as programmable blinds, window shades, high efficiency glass and annual air quality testing and monitoring programs is standard practice.

Floor Plans

Introducing the Owner

Crestpoint Real Estate Investments Ltd. (Crestpoint) is a commercial real estate investment manager dedicated to providing investors with direct access to commercial real estate assets. Through the execution of our disciplined investment approach and active management of our properties, we strive to deliver stable income and attractive long-term returns through a diversified portfolio of office, industrial, retail and multi-family residential properties.

Real estate investment management is all we do. We thereby avoid the distraction and potential conflicts that come with supporting other services such as property management, leasing brokerage and debt origination.

Crestpoint is part of Connor, Clark & Lunn Financial Group Ltd., a multi-boutique asset management firm whose affiliates collectively manage approximately $104 billion in assets for individuals, advisors and institutional investors.

The scale and high quality operational expertise provided by CC&L Financial Group enables us to focus on what we do best – identifying, acquiring and managing investment opportunities consistent with our investment strategies and ultimately delivering performance and creating value for our clients.

Crestpoint is owned 50% by Connor, Clark & Lunn Financial Group and 50% by Crestpoint’s senior management.

FEATURED PROPERTIES

ABB Montreal Campus

Montreal, Quebec

234 Laurier

Ottawa, Ontario

The Robertson Building

Toronto, Ontario

Awards

LEED® EB GOLD

Year 2018 — 2023

CERTIFICATE OF EXCELLENCE

Year 2017 — 2020

BOMA BEST

Year 2017 — 2020

WIRED SCORE PLATINUM

Year 2018 — 2020

RICK HANSEN FOUNDATION

Year 2018 — 2023

BRENDAN SULLIVAN
* Senior Vice President
+1 416 847 3262
[email protected]

DAVID BETHELL
* Senior Vice President
+1 416 815 2359
[email protected]

MYAH OLLEK
Sales Representative
+1 416 815 2353
[email protected]

CONOR BETHELL
Sales Representative
+1 647 943 4174
[email protected]

* Sales Representative